Three parts of engineering design: feasibility study, preliminary design and construction drawing design.
1. By the data collection and the feasibility study from the various specialties, Rhyther technicians ultimately determines a feasible scheme for the plant construction and write a feasibility study report, through the report, clients would have a general understanding of the dressing plant scale, investment scale, profit and other key factors.
In feasibility study step all the work of the working group to carry out, investigation data collection and plan optimization is the most important basis for selecting plant construction scheme. For these important parts, working group requires different professional division and cooperation including: geological specialty, mining specialty, mining machinery specialty, civil engineering specialty, electric power specialty, mineral dressing specialty etc.
2. Preliminary design after Feasibility study report approved, Rhyther starts preliminary design and comes up with the design of dressing plant construction. Design mainly involves: dressing, general layout, electric power, communication, civil engineering, environmental protection, water supply and drainage, tailings, safety and fire protection, investment estimates, economic benefit etc.
3. Construction drawing design, after the preliminary design is approved, starts to design working drawings. Every aspect of dressing plant needs a lot of construction drawings. When the working drawings completed, the designers must hand the drawings over to construction commanding officers,especially, the notes, strict regulation and important content.